SV International, Dong Nai, 3096 kWp

Project Highlight
Description
Commissioning

11 November 2020

Location

Binh Son IP, Long Thanh, Dong Nai Province

Installed Capacity

3096 kWp

Annual Yield

4334 MWh

Modules

6716

Inverters

23

Annual CO2 Savings

2452 tons

Rooftop solar system installed at SV International factory, Dong Nai province. The owner put the project with a capacity of 3096 kWp into operation on 11/11/2020.

Efficiency of Solar System

The owner expects the project to be able to produce an average of 4,334 MWh per year and 100% of the electricity will be fed into the national grid, reduce about 2452 tons of CO2 per year.