February 2016
Bais, Negros Oriental, Philippines
18 MWp
24,205 MWh
68,160 polycrystalline
46 SMA inverters
Fixed tilt, ground mount
213,292 sq meters
14,838 tons
The 18 MWp MonteSol solar farm was energized and commissioned on February 27, 2016. Monte Solar Energy Inc. (MonteSol) is a joint venture between Ayala Group’s AC Energy Holdings Inc. and Bronzeoak Philippines.
Located near Bais, Negros Oriental, Philippines, PV MonteSol generators produce about 24,205 MWh of solar power per year. This amount of electricity offsets about 14,838 tons of CO2 and powers 16,200 average Philippines households annually.