Citicore Toledo, Philippines – 60 MWp

Project Highlight
Description
Commissioning

April 2017

Location

Barangay Talavera, Toledo City, Philippines

Installed Capacity

60 MWp

Annual Yield

83,846 MWh

Modules

193,440 polycrystalline

Mounting System

Fixed tilt, ground mount

Size of Plant

730,000 sq meters

Annual CO2 Savings

46,923 tons

The 60 MWp solar farm project of Toledo Solar Corporation (FTSEC) was put into operation in April 2017. Located at Barangay Talavera, Toledo City, Philippines, Solar Energy Corporation Toledo is a wholly owned subsidiary of the renewable energy company, Citicore Power, Inc. and is considered the largest solar power plant on Cebu.

Efficiency of the solar system

The 193,440 modules of the 60 MWp Citicore Toledo PV Power Plant produce approximately 83,846 MWh of electricity per year. This electricity powers more than 50,000 homes in the Philippines and offsets 46,923 tons of CO2 emissions annually.