Thai Hoa IP, Long An, 6772 kWp

Project Highlight
Description
Commissioning

13 December 2020

Location

Thai Hoa, Duc Hoa, Long An

Installed Capacity

6772 kWp

Annual Yield

9684 MWh

Modules

15052

Inverters

52

Annual CO2 Savings

5478 tons

The 6,772 kWp rooftop solar system was installed on 17 roofs in 10 weeks. In particular, the project achieved COD two weeks before the FIT 2 deadline on December 31, 2020.

Commitment

The entire process from design, purchase, to installation is completed within 12 weeks from the time the contract is signed. At the same time, it still ensures safety during both construction as well as quality during long-term use.

Efficiency of rooftop solar system

This project located in Thai Hoa Industrial Park, Long An, is expected to produce an average of 9683 MWh and reduce about 5478 tons of CO2 per year.